Our Experience

Trusted on projects that move the world's bulk materials

CONVIN ENGINEERS has advised owners, EPCs, and operators on conveyor systems ranging from single transfer points to multi-kilometer overland networks.

Our work spans concept studies, bankable feasibility, detailed design, construction support, commissioning, and operational improvement — giving us a complete view of what makes a conveyor project successful.

Bulk material handling facility with conveyor systems and engineers reviewing operations
15+
Years of experience
75+
Projects supported
6
Continents served
50M+
Tons per year advised

Industries served

Every material behaves differently. Our cross-industry experience helps us apply proven solutions to new challenges.

Mining

Overland conveyors, in-pit crushing and conveying, stockyard systems, and underground belt installations.

Ports & Terminals

Ship loading, unloading, and terminal conveying for coal, iron ore, grains, and fertilizers.

Aggregates & Cement

Quarry, crusher, and plant conveyors for limestone, sand, gravel, and cement operations.

Power & Process

Coal handling systems, biomass feed, and process-plant conveyor integration.

Recycling & Waste

Sorting, transfer, and material recovery conveyors designed for abrasive and variable feed.

High-Capacity Systems

Engineering for large tonnage, high-lift, and long-distance bulk material transport.

Project gallery

A selection of conveyor systems, layouts, and engineering studies from our project work.

Elevated overland conveyor — Long-span trestle conveyor serving a cement plant.

Elevated overland conveyor

Long-span trestle conveyor serving a cement plant.

River crossing structure — Piered truss crossing on an overland conveyor route.

River crossing structure

Piered truss crossing on an overland conveyor route.

Curved overland conveyor — Horizontally curved conveyor replacing an aerial ropeway.

Curved overland conveyor

Horizontally curved conveyor replacing an aerial ropeway.

Tubular truss gallery — Long-distance conveyor through undulating terrain.

Tubular truss gallery

Long-distance conveyor through undulating terrain.

Plant approach conveyor — Overland conveyor terminating at the process plant.

Plant approach conveyor

Overland conveyor terminating at the process plant.

Loaded belt at transfer point — Coal handling belt at a port terminal transfer chute.

Loaded belt at transfer point

Coal handling belt at a port terminal transfer chute.

Plan view — overland route — 10.5 km alignment study over site topography.

Plan view — overland route

10.5 km alignment study over site topography.

Pulley and drive arrangement — Belt turnovers, take-ups, head and tail drive layout.

Pulley and drive arrangement

Belt turnovers, take-ups, head and tail drive layout.

Drive station general arrangement — 450 kW drive with gearbox, disc brakes and HPU.

Drive station general arrangement

450 kW drive with gearbox, disc brakes and HPU.

Controlled acceleration curve — S-curve start-up profile for an overland conveyor.

Controlled acceleration curve

S-curve start-up profile for an overland conveyor.

Belt turnover arrangement — 34 m typical turnover keeping the clean side of the belt on the return run.

Belt turnover arrangement

34 m typical turnover keeping the clean side of the belt on the return run.

Horizontal curve analysis — Belt tracking and edge-tension study through a horizontally curved section.

Horizontal curve analysis

Belt tracking and edge-tension study through a horizontally curved section.